U.S. TSUBAKI POWER-LOCK ®
Application Examples
Standard Installation
Single AS Series example Generally, a single unit can transmit high torque and axial load.
Single TF Series example This is the most standard installation form.
Two AS Series in a Row Torque transmission Mt and thrust load are doubled.
Phase Adjustments
Cam Phase Adjustments Restriction-free, fine phase adjustments can boost system performances.
Not locked into a fixed keyway.
More information at www.ustsubaki.com
Powered by FlippingBook