Continuous Flexing Cables for Motion Control
Installing cables into the cable carrier
Do not cut ring-coiled cables
When cutting cables prior to installation into the cable carrier, ring-coiled cables must be unspooled tangentially and not be pulled in loops off the top.
Uncoil cables from reels torsion-free
When cutting cables prior to installation into the cable carrier, drum-coiled cables must be unreeled, twist- and torsion-free.
Weight distribution inside the carrier cavity
When inserting the cables into the cable carrier, the cable weight is to be symmetrically distributed within the cavity width to assure maximum cycle life of the cable carrier and reduce the likelihood of cable carrier twist or tilt during operation.
Cable length
A change in the length of the cables after installation can be balanced out in the carrier loop. Thus, the cables must move freely inside the cable carrier at sufficient length and torsion-free.
18
800-443-4216
More information: tsubaki-kabelschlepp.com
Powered by FlippingBook