Configuration guidelines | Installation options
Opposite arrangement (schematic diagram)
L G
L W
L S
L S /2
1
3
2
5
6
Cross section of the cable carrier installation
B W B D B k
Abbreviated symbols: B D
1
= clear width in the running link
B G B k
= running link width
= cable carrier width B W = support carriage width (max. width) H = installation height of the cable carrier(s) H G = running link height L G = running link length L S = travel length L W = support carriage length
2
H
4
H G
The cable carrier installation type 225 consists of the following assemblies: 1 Cable carrier(s)
4 Running link 5 Steel cable 6 Cable tensioning roller 7 Tensioning device
with laterally attached track rollers and guide rollers 2 Support carriage with track rollers and guide rollers supporting across the entire length 3 Rolling carriage system with track rollers and guide rollers
89
Powered by FlippingBook